google.com, pub-2902074764665831, DIRECT, f08c47fec0942fa0
Roshan Kashmir
No Result
View All Result
  • Lead
  • J&K
    • Kashmir
    • Jammu
    • Ladakh
  • National
  • International
  • Health
  • Sports
  • Editors Pick
  • Article
  • Weather
  • JOBS
  • E-Paper
  • Login
  • Lead
  • J&K
    • Kashmir
    • Jammu
    • Ladakh
  • National
  • International
  • Health
  • Sports
  • Editors Pick
  • Article
  • Weather
  • JOBS
  • E-Paper
No Result
View All Result
Roshan Kashmir
Home Kashmir

Wire-free markets in downtown, wooden bridge at Amira Kadal soon

Work already started, expected to be completed in next 4 months: CEO SSCL

News Desk by News Desk
December 9, 2023
0
Wire-free markets in downtown, wooden bridge at Amira Kadal soon
0
SHARES
607
VIEWS
Share on Facebook

Srinagar, Dec 09: Under the much-hyped Smart City project, the government is all set to come up with a couple more wire-free markets as well as a wooden bridge being constructed at the site of Old Amir Kadal bridge, which would be completed by the next four months.

RELATED POSTS

Chief Secretary releases DIPR Calendar-2026 and Official Diary

Eight years after blaze, Beerwah office building turns into dumping ground

Govt Assigns Interim Charge of JKBOSE Chairman to Secretary BOSE, Additional Charge of JKSCERT Director to DSEJ

Chief Executive Officer (CEO), Srinagar Smart City Limited (SSCL), Athar Aamir Khan as per the news agency—Kashmir News Observer (KNO) said that the work on various projects is in full swing at present including in downtown areas as well.

“In Shehr-e-Khaas, various projects like Dalagte-Gojwara road, Nalaimar Road, typical heritage markets including Zaina Kadal, Malarata stretch, Nawa Bazaar, Nawa Kadal, Karan Nagar and other projects have already been already taken up,” he said.

Khan further stated that besides roads, the work on sewerage and other related things have been started; the drainage networks are being laid while underground electricity is also being done in Zaina Kadal and Malaratta. “Like Residency Road, the work to lay the underground wires is being done also in heritage markets of the downtown including Zaina Kadal and Malaratta,” he said.

He added three types of roads are being designed at present, which include vehicle priority, shared streets and specifically for pedestrians for which tile paths and other things are being done.

About the heritage buildings, he said some of these buildings have deteriorated and to restore the façade, the work has been divided into four parts.

“At least 6-7 agencies are working in downtown areas at present and the work is being monitored on a daily basis,” he said.

He also informed that a wooden bridge is coming up at Amira Kadal, saying that the new wooden bridge is being constructed at the site of Old Amir Kadal bridge to integrate Lal Chowk and Riverfront with Hari Singh High Street, Goni Khan, Maharaja Bazar and other adjacent parts.

“The work to construct the bridge has been already started while a load testing was needed and is being done at present with NIT,” he said, adding that the work has been started in a full-fledged way and the project is expected to be completed in the next 3-4 months.

He also stated that Goni Khan, Maharaj bazar, Hari Singh High Street are being designed as plazas for the people.

Furthermore, he appealed the people to ensure maintenance of the projects being constructed by the government—(KNO)

ShareTweetSendShareScanShare
Previous Post

Police man shot at, injured in Bemina, Sgr

Next Post

Will act tough against those promoting anti national, terror narrative on social media: IGP Kashmir V K Birdi in Bandipora

Related Posts

Chief Secretary releases DIPR Calendar-2026 and Official Diary
Kashmir

Chief Secretary releases DIPR Calendar-2026 and Official Diary

January 12, 2026
Eight years after blaze, Beerwah office building turns into dumping ground
Kashmir

Eight years after blaze, Beerwah office building turns into dumping ground

January 12, 2026
JKBOSE | Important Notification for Class 11th Examinations (Annual/Regular 2020)
Jammu

Govt Assigns Interim Charge of JKBOSE Chairman to Secretary BOSE, Additional Charge of JKSCERT Director to DSEJ

January 12, 2026
SHO Pantha Chowk arrested by ACB
Lead

JKBOSE to Declare Class 10th and 12th Results on January 14; Minister Sakina Itoo

January 12, 2026
Jammu

J&K Police Seek Detailed Data on Mosques, Clerics Across Valley: Report

January 12, 2026
230 persons killed; property worth Rs 250 Cr damaged in fire incidents in Kashmir since 2018, reveal official figures
Kashmir

BSF constable dies after fire guts barrack in Bandipora

January 12, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

About Us

Kashmir Valley’s authentic and credible Daily Newspaper. This newspaper is publishing from Kashmir India since 2012 and gained an excellent reputation for neutral and authentic coverage across valley and its adjacent states.

News By Categories

  • Article
  • Brief
  • Editors Pick
  • Health
  • International
  • J&K
  • Jammu
  • JOBS
  • Kashmir
  • Ladakh
  • Lead
  • National
  • Sports
  • Uncategorized
  • Weather

More Info

  • About Us
  • Contact Us
  • Team

© 2021 Roshan Kashmir | Designed by Buucket

No Result
View All Result
  • Lead
  • J&K
    • Kashmir
    • Jammu
    • Ladakh
  • National
  • International
  • Health
  • Sports
  • Editors Pick
  • Article
  • Weather
  • JOBS
  • E-Paper

© 2021 Roshan Kashmir | Designed by Buucket

Welcome Back!

Login to your account below

Forgotten Password?

Create New Account!

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In