google.com, pub-2902074764665831, DIRECT, f08c47fec0942fa0
Roshan Kashmir
No Result
View All Result
  • Lead
  • J&K
    • Kashmir
    • Jammu
    • Ladakh
  • National
  • International
  • Health
  • Sports
  • Editors Pick
  • Article
  • Weather
  • JOBS
  • E-Paper
  • Login
  • Lead
  • J&K
    • Kashmir
    • Jammu
    • Ladakh
  • National
  • International
  • Health
  • Sports
  • Editors Pick
  • Article
  • Weather
  • JOBS
  • E-Paper
No Result
View All Result
Roshan Kashmir
Home Kashmir

Final track work on Udhampur-Srinagar-Baramulla Rail Link completed: Minister

Trial runs, inspections on 17-km Katra to Reasi section soon; Delhi-Kashmir train in March-April: Official

News Desk by News Desk
December 13, 2024
0
Final track work on Udhampur-Srinagar-Baramulla Rail Link completed: Minister

File pic

0
SHARES
172
VIEWS
Share on Facebook

Umaisar Gull Ganie

RELATED POSTS

Jammu and Kashmir storm into maiden Ranji Trophy final

EOW, Kashmir conducts raids in Shopian, Budgam in HDFC Bank fraud case, five employees nabbed

SBSP State President Vivek Bali Urges L.G J&K on Opening of Aharbal Tourist Destination, Raises Issues of Casual Labourers

Srinagar, Dec 13: The final track work for the Udhampur-Srinagar-Baramulla Rail Link Project (USBRL) has been completed, Union Minister Ashwini Vaishnaw announced on Friday.

In a post on the social media platform X, Vaishnaw described it as a “historic milestone.” He wrote: “Final track work on the Udhampur-Srinagar-Baramulla Rail Link is complete. The ballastless track work for the 3.2-km-long Tunnel T-33, located at the foothills of the Shri Mata Vaishno Devi Shrine and connecting Katra to Reasi, was successfully completed today at 2:00 AM.”

An official speaking with the news agency—Kashmir News Observer (KNO) said that work on the 17-km section between Katra and Reasi is now complete following the successful completion of the 3.2-km-long tunnel. “Inspections and trial runs are expected to begin soon on this stretch. The first train from Kashmir to Delhi is expected to commence operations within the next four months (March-April),” he said.

He said the third version of the Vande Bharat train, a sleeper variant, will serve as the new Delhi-Srinagar train, reducing the 800-kilometre journey time to less than 13 hours.

The newly constructed 46-km route from Sangaldan to Reasi has already been completed. This section passes through tunnels and the challenging terrain, Chenab Bridge—the world’s highest railway bridge—located in the Reasi district.

The iconic Chenab Bridge spans 1,315 metres, featuring an arch span of 467 meters and a height of 359 metres above the riverbed. It is considered a marvel of engineering.

“The section from Sangaldan to Reasi has been completed, and the Commissioner of Railway Safety (CRS) certificate has also been received,” the official said.

Earlier this year, the 48.1-km-long Banihal-Sangaldan section of the USBRL project was inaugurated by Prime Minister Narendra Modi during his visit to Jammu in February.

The Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, covering 272 km, was sanctioned in 1994-95. The alignment of USBRL involves the construction of numerous tunnels and bridges across highly rugged and mountainous terrain with challenging Himalayan geology. The project includes 38 tunnels with a combined length of 119 kilometres, featuring Tunnel T-49—the country’s longest transportation tunnel at 12.75 kilometres. Additionally, the project comprises 927 bridges totalling 13 kilometres in length, including the iconic Chenab and Anji Khad bridges—(KNO)

ShareTweetSendShareScanShare
Previous Post

Warning Shots fired in ongoing Dachigam operation, Searches Continue

Next Post

‘One nation, one election’ bill shouldn’t meet Article 370 fate: CM Omar

Related Posts

Jammu and Kashmir storm into maiden Ranji Trophy final
Kashmir

Jammu and Kashmir storm into maiden Ranji Trophy final

February 18, 2026
EOW, Kashmir conducts raids in Shopian, Budgam in HDFC Bank fraud case, five employees nabbed
Kashmir

EOW, Kashmir conducts raids in Shopian, Budgam in HDFC Bank fraud case, five employees nabbed

February 18, 2026
SBSP State President Vivek Bali Urges L.G J&K on Opening of Aharbal Tourist Destination, Raises Issues of Casual Labourers
Kashmir

SBSP State President Vivek Bali Urges L.G J&K on Opening of Aharbal Tourist Destination, Raises Issues of Casual Labourers

February 17, 2026
NIA raids residential house in Srinagar
Kashmir

NIA Raids House Of Retired Govt Employee In Srinagar

February 17, 2026
Lieutenant Governor Orders Reopening of more Tourist Spots in Jammu Kashmir
Jammu

Lieutenant Governor Orders Reopening of more Tourist Spots in Jammu Kashmir

February 16, 2026
J&K Police Mourn Demise of Former IGP Mohammad Ashraf Bedar
Kashmir

J&K Police Mourn Demise of Former IGP Mohammad Ashraf Bedar

February 16, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

About Us

Kashmir Valley’s authentic and credible Daily Newspaper. This newspaper is publishing from Kashmir India since 2012 and gained an excellent reputation for neutral and authentic coverage across valley and its adjacent states.

News By Categories

  • Article
  • Brief
  • Editors Pick
  • Health
  • International
  • J&K
  • Jammu
  • JOBS
  • Kashmir
  • Ladakh
  • Lead
  • National
  • Sports
  • Uncategorized
  • Weather

More Info

  • About Us
  • Contact Us
  • Team

© 2021 Roshan Kashmir | Designed by Buucket

No Result
View All Result
  • Lead
  • J&K
    • Kashmir
    • Jammu
    • Ladakh
  • National
  • International
  • Health
  • Sports
  • Editors Pick
  • Article
  • Weather
  • JOBS
  • E-Paper

© 2021 Roshan Kashmir | Designed by Buucket

Welcome Back!

Login to your account below

Forgotten Password?

Create New Account!

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In